Hardware
Tancher conducted the entire development cycle for this product (see the pictures to understand development stages and results). In a very short period of time (approximately 8 months), Tancher accomplished all the design, development, prototyping, and production arrangement, including all the production support tasks. |
Scope of work:
- Electronics design
- Component placement
- 3D modeling
- PCB design
- Mockup board development
- Vendor and supplier arrangement
- Prototype development
- Prototype manufacturing, assembly, and testing
- Manufacturer selection and inspection of production plant
- Product specification approval
- Software testing and equipment testing on production line development
- Support of production process and post-production tech support
|